Renovation of HVB Tower in full swing

    It’s plain to see that the renovation of the façade has begun: the façade elements have been dismantled as far as the seventh floor, and construction is underway inside the tower as well.

    The demolition of the interior has already progressed to the 13th floor but is, of course, not visible to the outside.